The Full Process

  1. Free no obligation site survey
  2. Formal quotation emailed/posted
  3. Any required adjustments discussed
  4. Final quotation emailed/posted
  5. Client returns signed contract
  6. Factory commences manufacture
  7. Delivery/installation dates agreed
  8. Team and materials allocated
  9. Site preparations
  10. Installation (typically 2 - 4 days)
  11. Clean up the site
  12. Client quality inspection, sign off
  13. Build manager formally hands over
  14. Build manager remains available to answer any questions
Slide Image Slide Image Slide Image Slide Image

FAQ's

"How do I choose the size that is right for my needs?"

We will discuss this and advise you using our experience with your requirements in mind. We will also advise on the ideal place to situate your new Garden Office.

"Will I need Planning Permission?"

In most cases planning permission is not required; however we will advise you on this when discussing your specific requirements.

"Can you really help give me the Garden Office I want and High standards I require?"

Our experience in design, manufacture and installation of Garden Offices and Studios has consistently met the exact needs of our clients. Expectations are often exceeded as our testimonials will show.

"Do I have to prepare the foundations or can you do this?"

Yes, we will supply you with a Screw Pad® base system, a concrete pad may be installed if conditions require it, we will advise on this.

"How long can I leave my new Garden Office before decorating?"

On completing the installation we apply a first stage base coat which will give your Garden Office around 2 months protection before you should treat or paint your Garden Building as you wish.